Main phases of repair works in the apartment.
How to begin repair works of the apartment?
The first stage of the repair of old homes is the damage and dismantling first of all of the worn out walls and partition walls, removing the wall and ceiling finishing. This phase is one of the most "dirty" stages of the repair.
One more among the most crucial and "dusty" works is the window block replacement. It is necessary to do this first off since dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is required to load them immediately in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).
The following phase is wiring. Electrical wiring can be set up in walls or along the floor. Wiring is made inside the pipes to guarantee electrical safety and increase dependability. The pipe protects wiring from external damages and allows to replace the wire totally without breaking walls and floor simply by placing the new wire instead of the old one.
House Painting follows the electrical wiring. The regular error throughout the simultaneous conducting of such works takes place when workers forget to set out one of the cable televisions and house painters have already plastered and smoothed out the wall. As an outcome, extra works are needed to seal goes after on the ended up wall. The locations of the feed switch and wall outlet place and their number should be thought-out in advance. The plan of power circuitry is generally included into the style project.
Later on the system need to be all set to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable are laid out. The power cable television need to not be laid out near the telephone and antenna cable televisions to avoid noise pickup and interference. The most strange moment is setting out the television cable television. In order to make two (or three) TV sets in the home the 2nd cable is typically just "firmly soldered" in parallel, so the cable television resistance is lowered. As an outcome, the screen quality is weakened, many programs can't be gotten and etc. In order to avoid such circumstance it is required to welcome an expert with unique equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is conducted simultaneously in all properties, if it is possible. Delays are linked with the innovation. Each used layer of the plaster (or filling out completing) need to dry completely before the work will continue.
Works in sanitary plans and the kitchen start concurrently with house painting. It is much better to meet so-called "unclean" works in the top place and at the same time. plumbing misconceptions clarified In accordance with the strategy of the hygienic technician area welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then operates in hygienic arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following stage is assembling ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and accessories are mounted.
After wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface Emergency Advice area look. The surface puttying of walls is performed concurrently. The technically specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.
The following phase is the procedure of fill. Fill can be made with various materials-- from typical masonry cement-sand mix to self-aligning floorings. The benefit of the simple mix is its cheapness, the drawback is that such mix is much harder aligned at the level and the final dry time of such fill is 40 days, just then the next stage of the deal with floor can be conducted, i.e. the duration is too long. Self-leveling self-aligning floors are a lot more costly, however more technological. Aligning occurs almost "automatically" i.e. fluid service of mix is put out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are set up. Installation of doors should take into the account thickness of future floor covering. After installation the door can be removed its hinges and removed up until the end of repair work or packed into polyethylene film to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that premises where it was planned. The tile needs to be laid on the definitely dry overlay.
Finishing of the flooring mounting depends upon the planned covering. For the most part (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.
In premises where surface covering of the floor is laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned repercussion is connected only with such rushing procedure when the excellent amount of dust is created. In spite of the truth that good flooring mills are equipped with the vacuum cleaner, the sufficient amount of dust is sped up on surrounding subjects including walls. Dust is extremely acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be ended up. It is left just to set up the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is essential to keep in mind that the series of works was listed in basic and can change depending upon the definite scenario-- the number of rooms in facility, your resources, peculiarities of the building and construction of the multilevel facilities. It is based upon good sense and every person efficient in analysis can individually produce such a series.